Scope of Work required matching the new Library structure to an existing building. A 4,200sf wood framed addition was added to the existing Community Centre to accommodate the relocated library. The rooflines were blended together and the canopy entrance to the Library was matched to the existing structure.

The parking lot was removed and will be re-paved as the new Library is commissioned.

Elgin is the general contractor on this project and will be drawing on their restoration skills to build a pleasing addition to the Community Centre portion of the build.